Military Industrial Complex Logo

HDR Architecture, Incorporated Contract Details



Defense contract under the Navy awarded to HDR Architecture, Incorporated on 8/25/2016.

Per the U.S. DoD, * Indicates a "small business" classification and ** indicates a "small disadvantaged business". NOTE: the U.S. DoD only publicly reports contracts valued at $6.5 million USD or greater.


The contract language is EXACTLY as it appears on the official U.S. DoD website (http://www.defense.gov/contracts/) unless otherwise noted.




Contractor: HDR Architecture, Incorporated
Department: Navy
Awarded: 8/25/2016


HDR Architecture Inc., San Diego, California, is being awarded $9,258,653 for firm-fixed-price task order 0002 under a previously awarded architect-engineer indefinite-delivery/indefinite quantity contract (N62473-16-D-1850) to prepare full plans and specifications, detailed cost estimate, geotechnical investigation, and hazardous materials survey at Marine Corps Air Station Miramar. The work to be performed provides for the full design for constructing a two-story low rise two squadron module Type 1 maintenance hangar. It also includes the replacement of an existing aircraft parking apron that will realign Quebec taxiway lighting and markings and full design for constructing an extension to the existing C-130 aircraft parking apron including ready service magazine and tactical support van pad, airfield lighting, striping, and asphalt shoulders. Work will be performed in San Diego, California, and is expected to be completed by October 2017. Fiscal 2016 military construction (Navy) contract funds in the amount of $9,258,653 are obligated on this award; $1,518,086 will expire at the end of the current fiscal year. One proposal was received for this task order. The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity.


Total Contract Value: $9,258,653


View all contracts that include "HDR Architecture, Incorporated" in the MiC database.